Tower

The Division Chief

3

Stories

Overview

Tower Details

The Division Chief is a 36′ high fire training tower incorporating features from both the Lieutenant and the Assistant Fire Chief. With a footprint spanning 16′ wide x 36′ long, the Division Chief features seven rooms for the ultimate in training. The maze room, comprised of 12 movable, slide-able, and lockable partitions, allows training officers to challenge trainees time after time by redesigning the room into any configuration. The tower’s inset corner balcony offers a secure and realistic area to practice rappelling and laddering.

Endless Training Scenarios

Vertical Confined Spaces
Ventilation
Room Search / Clearing
Riser Operation
Live Fire Attack
Laddering and Rappelling
Helicopter Deployment
Forced Entry

Training Tower

3-Story
Tower

Dimensions 22’L x 16’W x 36’H
Roof Flat
Roof Live Load 100 PSF
Wind Load Per Local Codes
Deck Live Load 100 PSF

Included

  • Parapet Roof Guard with Chained Opening
  • Interior Stair to 4th Floor
  • Interior Fixed Ladder, 4th Floor to Roof
  • (2) 3’x7′ Exterior Steel Door
  • (1) 3′ x 7′ Interior Steel Door
  • (9) 3’x4′ Window Openings with Steel Shutters
  • (1) 2’6″ x 3′ Bilco Roof Hatch
  • (1) 2nd Floor 6′ x 8′ Inset Balcony

Residential Section

Gable-Roof
Residence

Dimensions 14’L x 16’W x 25’H
Roof 16° Gable
Roof Live Load 100 PSF
Wind Load Per Local Codes
Deck Live Load 100 PSF

Included

  • Roof Ladder Fender Brackets
  • (1) 3′ x 7′ Exterior Steel Door
  • (3) 3′ x 3′ Window Openings with Steel Shutters
  • (1) 3′ x 4′ Window Openings with Steel Shutters
  • (2) 3’x 3′ Hinged Gable Louvers
  • (2) 4′ x 4′ Roof Chop-Out Curbs
  • (1) 1st Floor Burn Room
  • (1) 2nd Floor Maze Room
  • (1) Westec® Insulation System
  • (1) Scout Temperature Monitoring System

Accessories

Configure it for the way you train

Balconies

Doors

Temperature Monitoring

Land Area Requirements

Plan your site

Basic building site 1.00 acre
Drafting pit 0.20 acre
Vehicle extrication pad 0.20 acre
Rail car spill 0.60 acre
Tank truck spill/roll-over 0.20 acre
Flammable liquid pond 0.10 acre
Electric transformer pad 0.10 acre
Aircraft rescue pad 0.70 acre
Classroom building 0.30 acre
Garage 0.30 acre

Get Started

Build The Division Chief for Your Department

Tell us about your training goals and site. Our team will help you configure this model, sections, accessories, and colors for the way you train.